top of page


STREAMWISE
Rick Poore
Owner/Principal
Stream Assessment and Restoration
Achieving restoration goals with natural
stream form, processes, and function.

Pre-project gully (approx 1.2 mile length).

Filling incised gully reach. 2009.

Upper borrow pond.

Design channel at bankfull condition.

Post-project restored floodplain/wetland.

Cross-vane grade control at end of project.
Big Bear Flat Restoration
bottom of page